DETAIL 04 / VALUE-ENGINEERING
Value Engineering
Cut waste. Keep strength. Clarify the BOQ.
Method
We review drawings, quantities and construction sequence to reduce cost without cutting safety. Alternatives are compared in plain language so the client can choose with confidence.
Typical timeline
5–10 working days after drawings and BOQ are shared
Standards
- IS 456 (assessment context)
- Relevant material IS codes
Deliverables
- Cost optimisation reviews
- BOQ and specification alternatives
- Material and method comparisons
- Value-engineering summary note
Related projects
- RRCC/018/2024 — Value engineering review