Geotechnical Engineering

DETAIL 01 / GEOTECHNICAL-ENGINEERING

Geotechnical Engineering

Know the ground before you pour.

Method

Boreholes are logged on site. Disturbed and undisturbed samples go to the lab. SPT N-values and plate load results feed a bearing capacity calculation and a written foundation recommendation.

Typical timeline

7–10 working days after field work

Standards

  • IS 1892
  • IS 2131
  • IS 6403

Deliverables

  • Soil investigation and borehole logging
  • SPT and plate load test
  • Bearing capacity report
  • Foundation recommendation